Sub-Project 2
“Upgrading the Road II-86 – Srednogortsi-Rudozem and bypass of Rudozem”, implemented by Road Infrastructure Agency (BG).
Upgrade and improvement of 9.653 km divided into 3 sections: section 1 from km 125+727.46 to km 126+600 and from km 126+750 to km 129+660 – partial reconstruction of some road sections and construction of a new road; construction of 2 new bridges, reconstruction of 9 old bridges.
Objectives of the subproject are:
The improvement of traffic conditions and travelers comfort; enhancement of road safety and traffic capacity; removal of the transit traffic to the future Border Crossing Check Point (BCCP) Dimario –Rudozem out of the city center of Rudozem by building a bypass road; reduction of harmful gas emissions.
Expected results are:
Upgraded 9.653 km of the road connection to the proposed for construction within this Project BCCP Rudozem – Xanthi. This will increase the traffic capacity to the BCCP and will improve the mobility of goods and people between both countries; will reduce the travel time and will remove the transit traffic to the future BCCP out of the city center of Rudozem by building a bypass road.
Expected outputs:
Upgraded 9.653 km divided into 3 sections: section 1 from km 125+727.46 to km 126+600 and from km 126+750 to km 129+660 – reconstruction and upgrading; section 2 from km 129+660 to km 132+920 – upgrading; section 3 from km 132+920 to km 135+530 – partial reconstruction of some road sections and construction of new road; construction of 2 new bridges, reconstruction of 9 old bridges;